Port of San Diego Pond 20 Mitigation Bank*

Pond 20-1-GE.jpg

Port of San Diego Pond 20 Mitigation Bank,

Imperial Beach, CA

 

The Pond 20 Mitigation Bank required the work from a multidisciplinary team of scientists to evaluate the feasibility of using the 95 acre site for environmental mitigation on behalf of the San Diego Unified Port District. Project engineers were consulted to ensure the preliminary concept plan was fully implementable from a hydrological and plant establishment perspective.


 
 